Section A - Conceptual Architectural DesignFee - starting at Rs. 2,45,000/- inclusive of taxes.
No of Drawings - 15 No. Delivered Drawings include - Floor Plans (2 No), Sections, Elevations, External 3D View of the House along with Area Statement Time Frame - 20 to 30 Days Revisions - Four Revisions to floor plan designs and any other modifications. Additional drawings are charged separately Sample Drawings - Check the Sample Drawings Page on our Website to see the quality of drawings that you can expect at the end of the process. Drawings included:
1. Area Statement 2. Site Layout Drawing 3. Floor Plans - Ground Floor, First Floor, etc 4. Roof Plan 5. Sections - 1 No. 6. External Elevations - 4 No. 7. 3D Views of House - 2 No 8. Basic Specification for the House |
Section A - Conceptual Architectural Designsame as mentioned under section A
Section B - Detailed Architectural DesignFee - starting at Rs. 9,50,000/- (for bungalow project till 4000 sq.ft. BUA)
and starting at Rs. 16,50,000/- (for apartment building of Ground +3 and above) No of Drawings - 45 No. (approx.) Delivered Drawings include - Detailed Floor Plans, Sections, Elevations, Detailed Wall Sections, External 3D View of the House, Water Tank detail, Door detail, Window detail, Railing details, Schedule of finishes, etc. Time Frame - 45 to 60 Days Revisions - No revisions are done to these drawings and these are only started once the Conceptual Architectural Design is finished or finalized. Section C - Structural Design & DetailingNo of Drawings - 20 No.
Delivered Drawings include - Footing Drawings, Slab Drawings and Schedule, Coloumn & Beam Drawings and Schedule, Water Tank Drawings, Compound Wall drawings, etc. Time Frame - Worked out within the same time period as detailed architectural drawings. Revisions - This work is done in conjunction with detailed architectural design. Section D - Basic Electrical and Plumbing DrawingsNo of Drawings - 10 No. (approx)
Delivered Drawings include - Electrical and Plumbing Drawings for all floor plans along with Schedule of Fixtures and Specs. Time Frame - Worked out within the same time period as detailed architectural drawings. Revisions - This work is done in conjunction with detailed architectural design. Section E - Cost Estimation for Concept DesignNo of Sheets in the Document - 5 No.
Time Frame - 10 to 15 Days Revisions - Each revision is charged separately Section F - Bill of Quantities for Final Detailed Drawings and DocumentsNo of Sheets in the Document - 45 No.
Time Frame - 14 to 20 Days Revisions - No revisions are done. Section G - Overseeing project during Execution PhaseTime Frame - Period of Construction
Section H - Site Visits by Architect / Structural Engineer or Meeting with ClientTime Frame - Period of Construction
Section I - Printed Set of Drawings |